Research Projects
The R&D wing of TANGEDCO carries out several important Research Studies in the Power Sector that are beneficial not only to improve its own Operation & Maintenance but for all utilities engaged in Power Generation, Transmission and Distribution. Many of the Research studies are fully funded by the Ministry of Power / Government of India. The study Completion Reports with conclusions and recommendations are available with TANGEDCO /R&D and with the RSOP study co-ordinating agency CPRI / Bangalore.
Research Projects
- 1. TANII – Projects:
- (a). Retro filling of distribution class transformers with bio- degradable non flammable synthetic ester oil.
- (b). Transformer Insulation preservation using Innovative External Bellows
- 2. RSoP-Project:
- Dielectric diagnosis of EHV bushings using Frequency Domain Spectroscopy(FDS) including cause identification for abnormal conditions of the bushing.
Research Projects
- Establishing 20KWp Roof top Solar Power Plant at MLDC building.
- Condition monitoring of Generators in Power Stations using online Partial Discharge Measurements and off-line Tan Delta measurements.
- Research study on improving Transformer insulation preservation system.
- Establishing 60KWp Roof top LT grid connected Solar Plant at the high rise building of TANGEDCO Head Quarters.
- On-line condition monitoring of Transformer Bushings.
- Cause of failures of sub-station batteries and evolving proper condition monitoring techniques.
- Study on Furanic compounds in Transformer oil.
- Performance of Reclaimed oil in Distribution Transformers and usage of Reclaimed oil in Power Transformers.
- Analysing the causes of higher Tan Delta and abnormal DGA results in 110KV CTs.
- Methods of Testing and Condition Monitoring of On Load Tap Changer (OLTC) in Power / Auto Transformers.
- Study on Failure of Capacitor Voltage Transformer in EHV Substations.
- Tan delta and Capacitance value of HV Transformer Bushings including the effect of source voltage variants on Tan Delta values and arriving at acceptable limit values for in service Bushings.
- Method of Monitoring Current Transformer Insulation through Tan delta Testing and to Establish Normal values of Tan Delta for various make Current Transformers and Age groups.
Contact Info:
- Superintending Engineer / R&D/Chennai Ph : 28591236
- Executive Engineer / R&L / R&D/Chennai Ph: 28520131 Extn : 2402
- Executive Engineer / R&D Projects / R&D/Chennai Ph : 28520131 Extn : 2487